Galloper OSS Topside Rolled Onto Barge
The substation topside built by Heerema Fabrication Group for the 336MW Galloper offshore wind farm has been loaded onto a barge at the fabricator’s Hartlepool yard.Source: Galloper OSS Topside Rolled Onto Barge“>Offshore Wind News